Guardrail removal work begins today (March 18, 2024) on the overhead bridge on Interstate 90 at Kimball (exit 284). Traffic will be reduced to one lane, the speed limit will be reduced to 65 mph through the work zone and a 12-foot width restriction will be in place.
Beginning in early April, concrete barriers will be installed and work will begin on pavement replacement at the bridge ends on the Kimball overhead. Then work will begin on pavement replacement on the structure over Platte Creek located two miles west of the White Lake exit.
This work is part of a $20.9 million project that includes asphalt concrete milling, asphalt concrete surfacing, structure repairs, and guardrail work from mile marker 272, one mile west of Pukwana to mile marker 297, one half mile east of the White Lake exit. The milling and asphalt resurfacing are scheduled to start June 3, 2024. The structure and paving work are scheduled to be completed by Oct. 25, 2024.
Comments