The Cheyenne River Sioux Tribe Telephone Authority will be doing maintenance work today and tomorrow (May 17-18, 2022) on the telephone line and conduit attached to the US Highway 212 Missouri River Bridge west of Gettysburg.
The bridge will be reduced to one lane from 8am CDT to 7pm CDT (7am MDT to 6pm MDT) each day. During working hours, a 12-foot maximum width restriction will be put in place across the bridge and traffic will be controlled with the use of flaggers. Travelers can expect delays of less than five minutes.
There will be no width restrictions in place during non-working hours.
Comments